Jeep First Year

Wednesday, September 9, 2009

Kick Some Assembly

So you can see in these pictures that progress is being made. There are still a lot of loose ends to be fixed, but the main things in the pipeline are:


Wiring the whole jeep, running fuel lines, brake lines, etc.

Dash: This is part of wiring,but also involves a lot of fabrication.

Paint: I have to paint the rollcage, fuel rack, bumpers, fuel cans, dash, etc.

The pedals are installed, I painted all the hardware gloss black.

Seat risers. Oh I sold the nasty bucket seats these came with for $25.

The steering wheel got more of a satin black treatment, as that was closer to the original color.

Here is what the jeep is looking like these days.

Engine shots, it needs a good rinse from all the crazy sanding dust.

Oh, I finally have the steering wheel installed!

Steering knuckle.